adit

n.  (水平)坑道;出入口

复数:adits

机械

COCA.45635



双语例句

  1. Nonlinear FEA of high core wall rockfill dam adit surrounding rock nonlinear destruction reasons and controlling ways
    高心墙堆石坝非线性有限元应力变形分析巷道围岩非线性变形破坏机理及其控制方法
  2. Study on application of distributed optical fiber technique to monitoring slope structure of geological adit for Jinping Hydropower Station I
    分布式光纤技术在锦屏一级水电站地质平硐边坡监测中的应用研究
  3. The Influence Mechnism of Nonlinear Vibration and Its Reduction for Coriolis Mass Flowmeter ADIT SURROUNDING ROCK NONLINEAR DESTRUCTION REASONS AND CONTROLLING WAYS
    科氏质量流量计的非线性影响机理分析与抑制巷道围岩非线性变形破坏机理及其控制方法
  4. Adit deep chute; Open gold mine; Application;
    平硐深溜井;露天金矿;应用;
  5. With the progress of the mining operation in Lanjian Iron Ore year on year the effect of blasting vibration on safety of adit is increasing.
    随着兰尖铁矿采场水平逐年下降,爆破震动对平硐的安全影响日益突出。
  6. Site Monitoring and Analysis of Cooling Measures during the Parallel Adit Construction in Qinling No. 2 Tunnel
    秦岭特长隧道Ⅱ线平导施工降温措施的现场监测和研究分析
  7. The application of engineering geology to specific adit digging at deep shaft
    工程地质在深井中特殊硐室开挖中的应用
  8. Estimation of Adit Dirt Volume in Longtan Hydropower Station Dam Area
    龙滩水电站坝址区平洞结垢量的估算
  9. By applying comprehensive opencasting technology and comprehensive technical research of the main adit reinforcement and monitoring, Nanfen open pit mine has ensured a safe production of its adit chute transportation system and meanwhile created enormous economic value.
    南芬露天铁矿应用露天开采综合技术和主平硐加固与监测的综合技术研究,确保了平硐-溜井运输系统的安全生产,创造了巨大的经济价值;
  10. Analysis on Fault Treatment of Lower Adit in Plant A of Huizhou Pumped Storage Power Station
    惠州抽水蓄能电站A厂下平洞断层处理分析
  11. Adit surrounding rock nonlinear destruction reasons and controlling ways
    巷道围岩非线性变形破坏机理及其控制方法
  12. Model of a complete set of machinery during rapid construction of parallel guiding adit at East Qinling Tunnel
    东秦岭隧道平导快速施工机械设备配套模式
  13. Underground Excavation Conversion Technology for Entering Main Construction through Subway Large Adit
    地铁特大风道进主体暗挖施工转换技术
  14. Machinery and equipment in construction of the adit of Wulong tunnel
    武隆隧道横洞工区机械设备的选型与配套
  15. Introduction to the Management of Rapid Construction in Extra Long Tunnel under Hard Rock by Parallel Adit Drilling and Blasting Method Borehole Blasting with Water-couple Charge and Its Application in Tunnel Engineering
    浅谈硬岩特长隧道平导钻爆法快速施工的管理水介质耦合钻孔爆破及其在隧道工程中的应用
  16. A tunnel horizontal to the surface leading to a mine is called an adit. There are also vertical shafts at right angle to the surface and inclined or slope shafts at another angle to the surface.
    与地表平行通向井下的坑道是平峒。还有与地表成直角的竖井,与地表成一定角度的斜井。
  17. ADIT ( Analog-Digital Integrating Translator) Application of electronic transformer to digitalization substation and analysis
    模拟-数字积分变换器电子互感器在数字化变电站应用分析
  18. Control Measurement and Hole-Through Survey within Parallel Adit of No. ⅱ Line in Qinling Extra-Long Tunnel
    秦岭特长隧道Ⅱ线平导洞内控制测量和贯通测量
  19. Research on Allowable Peak Particle Vibration Velocity for Transport Adit in Blasting in Open-Pit Mine
    露天爆破运输平硐允许峰值质点振动速度的研究
  20. Study on the Adit Stability Under Dynamic Blasting Load
    爆破动载荷下平硐稳定性的研究
  21. Through the field monitoring of blasting seismic wave and using the blasting shock damage criterion, the causes for the block-dropping in the adit were analyzed and the allowable peak particle vibration velocity for the adit was given.
    通过现场爆破地震波的监测,结合爆破震动破坏判据,分析了平硐产生落块的原因,给出了平硐的允许峰值质点振动速度的建议值。
  22. This article introduces the main achievements of Chinese engineering blasting development from the following aspects: adit blasting, long hole blasting, dismantle blasting, blasting equipments and security technology.
    文章从硐室爆破技术、深孔爆破、拆除爆破、爆破器材、安全技术等七个方面论述了中国工程爆破科技发展的主要成就;
  23. The seepage field analysis at the higher reservoir level shows that the reservoir water seeps through the blocks No. 18 and 22 and the foundation of the right grouting adit, directly replenishes the groundwater of the right abutment.
    较高库水位时的渗流场分析表明,库水渗过18~22坝段和右灌浆平洞基础,直接对右坝肩地下水进行补给;
  24. Technical Analysis of Adit-pass at Zijinshan Open Pit
    紫金山金矿露天采场平硐溜井技术分析
  25. The measured adit water temperature verifies the predicted results and the system behavior proves desirable.
    系统运行后,坑道水温度变化实测数据基本验证了预测结果,系统运行效果良好。
  26. The stress field basic character of the abutment slope is obtained, according to the result of slope stress field test by the method of adit wall stress relief& recovery measuring, combining borehole radial deformation and the method.
    采用平硐洞壁应力解除&恢复法对边坡应力分布进行了测试,并结合孔径变形法应力测试成果,分析得出了坝肩边坡应力场的基本特征。
  27. Through investigating the intensity and deformation character by sampling and experimenting with adit and vertical shaft, observing whether there is weak seem to affect the stability of tunnel, the rock is graded according to the rock quality.
    取岩块,挖平洞、竖井做实验,研究其强度和变形特征,观察有无软弱夹层对洞室稳定的影响,在此基础上进行基本质量级别分级。
  28. Drill Core and Adit Engineering Geological Study
    岩心与坑道的工程地质研究
  29. The paper reviews the design and construction of the long inclined shafts, the deep vertical shaft, the parallel adit and the access adit for the tunnel.
    文章介绍了越岭隧道的长斜井、深竖井、平导、横洞的设计和施工情况。
  30. The undisturbed soil is usually sampled through excavating shaft and adit, but through borehole sampling for deep soil.
    目前,在工程实践中对原状土样的采取多通过开挖竖井及平洞的方法进行,但在埋深较大的情况下,由于开挖竖井及平洞较为困难,多采取钻探取样的方法。

英英释义

noun

  1. a nearly horizontal passage from the surface into a mine