Against the question of low usage of practical Decentral Co-generation System, the prime constrained reason is got after investigation and study. 针对案例分布式供能系统实际利用率低的问题,经调查分析得到制约主因;
The drawn conclusion can provide it with reference that engineering design and application of Decentral Co-generation System. 得出的结论可为分布式供能系统的工程设计和应用提供参考。
The concepts of generalized fixed modes ( include generalized finite fixed modes and generalized infinite fixed modes) in generalized decentral control systems are presented, and, some properties and critical methods of generalized fixed modes are obtained. 本文首先提出了广义分散控制系统的广义固定模(其中包括广义有限固定模、广义无穷固定模),之后给出了广义固定模的一些性质和判别方法。
The complications during the operation mainly included thin flap, incomplete flap, free flap, decentral flap, foreign body in the interface, flap wrinkle and subconjunctival hemorrhage etc; 结果:术中主要并发症有薄角膜瓣、不完全角膜瓣、游离角膜瓣、角膜瓣偏离中心、层间异物残留、角膜瓣皱褶和结膜下出血等;
Discussion of fire control safety design of decentral co-generation system 分布式供能系统消防安全设计的探讨