Analysis and calculation of settlement of groynes built by toe-shooting method 爆炸排淤填石法堤坝的沉降分析与计算
This paper presents the mechanism of erosion scour around groynes of levee projects and a probability method of the reliability analysis for groyne erosion under random factors. 分析了防护丁坝冲刷的机理,用概率分析方法研究了在随机因素影响下防护丁坝抗冲刷的可靠性问题。
It is shown by the study that permeable pile groynes can play the role of control and guide obviously only for the plan and conditions of water and sediment adopted in the test. 结果表明:在试验方案及水沙条件下,透水桩坝可以起到较明显的控导作用;
The analysis could provide an advanced basis for the reliability evaluation and design of groynes of levee projects. 该分析能为防护丁坝系统的抗冲刷可靠性评估和设计提供有实用价值的方法。
The effects of permeable pile groynes laid out along the thalweg in control and guide the regime of the lower Yellow River have been studied through movable bed model tests. 通过河工动床模型试验,对沿治导线布设形式的透水桩坝在黄河下游控导河势的效果进行了研究。
Model Test and Study on Control and Guide Effects of Permeable Pile Groynes Situated on the Lower Yellow River 黄河下游透水桩坝控导效果模型试验研究