For this article, we'll convert the code to use a load-time modification approach, and to support pattern-matching for specifying the classes and methods to be timed. 对于本文,我们将把代码转换为使用加载时修改方法,并将它转换为可支持模式匹配,用以指定要定时的类和方法。
Dashboard latency and load-time improvements 仪表板延迟和加载时间改进
This is due to the fact that they enhanced their AspectJ load-time weaver to transparently "switch from load-time to binary weaving following the first execution of an application." 这是由于他们强化了AspectJ装载时编织器,以透明地“在应用第一次执行后从装载时编织切换到二进制编织。”
We are using a small handful of the JVM TI methods in order to instrument the application at load-time. 我们使用的是小部分JVMTI方法,从而在载入的时候为应用程序提供工具。
This constraint limits the applications for load-time transformation. 这一约束限制了申请载荷-时间转型。
Load-time transformation is incremental: The transformer processes individual classes one at a time as they are loaded. 载荷-时间转型是增量:变压器过程中的个别班级一个在一个时间,因为他们已经上膛。
Bytecode transformers can be run offline ( compile time), at load-time, or dynamically at run-time ( using JVMTI API). 字节码转换器在离线状态(编译期)、在装载期都能运行,还能在运行时动态运行(使用JVMTIAPI)。
Using Load-time, Displacement-time and Load displacement Curve achieved by a Bar Impact Testing Machine determines dynamic fracture toughness KId and the groove opening displacement V for marble. 运用杆式冲击试验机加载获得载荷、位移张开量、以及载荷位移张开量的动态变化和互相关系,测定了两种岩石的动态断裂韧度、位移张开量。
Weaving cost at build time but full speed load-time. 织入在构建时花费时间,但在加载时是全速的。
Therefore, by using load-time weaving you incur absolutely no overhead for those methods that don't have profiling turned on. 因此,通过使用加载时编织你可以保证那些没有启用性能监控的方法绝没有额外的负担。
This paper first analyzes the working condition of ladle turret, and defined the finite element computation of ladle turret and load-time history of fatigue analysis. 论文中,首先分析了钢包回转台的载荷工况,确定了钢包回转台有限元计算与疲劳分析的载荷谱;
Based on the actural load-time history for the runner of a cross flow turbine at hydropower station, the probability distribution function for load amplitude under any head can be obtained by data processing. 本文根据水电站现场测试双击武水轮机载荷时间历程,通过数据处理得到任一水头下载荷幅值概率分布函数。
Since there exists relationship among load, displacement and impact velocity for long bar, the displacement and J-integral can be calculated from recorded load-time curve. 由于长杆条件下存在荷载、位移及冲击速度之间的定量关系,试验中只需对荷载的时间历程进行测定,就能间接地计算出位移和J积分值。
Using ADAMS, the dynamic response of ladle turret's supporting arm is confirmed, which helps to get the dynamic response coefficient, hence successfully setting up the load-time history of ladle turret's supporting arm. 采用ADAMS动力学仿真软件确定了钢包回转台支撑臂的动态响应,并据此确定了其动载系数,从而较科学合理地获得了钢包回转台支撑臂的载荷谱;
The determination of load-time curve for a reactor containment which undergoes the impact of an airplane 飞机撞击核反应堆安全壳荷载-时间曲线的确定
Simulation results show that the compression load-time curves of the three element models have the same general trend. There are roughly three stages, elastic region, plastic platform region and intensification region. 模拟结果显示,这三种单元模型的压缩载荷-时间曲线大体趋势相同,都有弹性、塑性平台和密集化三个阶段。
Loading spectrum is the load-time history which can reflect the true working conditions, that is, the stress or strain of component suffered. 载荷谱是反映真实工作状况的载荷-时间历程,即零部件随时间变化所受的应力或应变。
Compiling load spectrum needs to obtain load-time history. Make bearing structure itself as a force sensor is a common method in load testing. 编制载荷谱需要获得载荷&时间历程,利用承载结构自身作为力传感元件进行载荷测试是一种常用的方式。
Parameters are selected and boundary conditions are defined based on the finite element modal analysis. According to the load-time curve loads on the top of the derrick, the transient dynamic analysis is carried out on the derrick. 在模态分析的基础上选择有限元参数、施加边界条件以及根据载荷-时间曲线在井架顶部施加载荷,对井架进行瞬态动力学分析。
As for stitched braided composites with the same structural parameters, they show the similar load-time curves and energy-time curves. 相同组成结构的缝合编织复合材料有相似的冲击载荷-时间曲线、冲击能量-时间曲线。