Investigation of heat transfer characteristics of aircraft icing under runback water 溢流条件下飞机结冰过程的传热特性研究
Test of the runback function in a thermal power plant 火力发电厂RUNBACK功能试验
Runback Test of Primary Air Fan and Analysis on Ending 锅炉一次风机RB试验及改进结果分析
Design and test of RUNBACK function of 200 MW unit 200MW机组RUNBACK功能的设计与试验
Study on runback controlling strategy of 300 MW Unit 300MW机组RB控制策略研究
Tests and analysis on RUNBACK operation status for a 300 MW coal-fired unit 300MW燃煤机组RB工况试验及分析
Analysis and improvement of runback process of feedwater pump for 300 MW generating unit 300MW机组给水泵RB工况的处理及分析
Research on RUNBACK Test of 600 MW Unit 600MW机组RUNBACK性能试验的研究
Government must invest these items that need many money, runback in long-term, have outside economy and enterprise do not will or have no ability to invest in. 政府投资的方向应主要侧重于投资金额巨大、回收期长、具有明显的外部经济性等企业不愿涉足或无力承担的项目。
Simulation of Runback Condition in 300 MW Thermal Power Unit Simulator 300MW火电机组仿真机的快速减负荷(RB)工况仿真
Test and research on feed pump RUNBACK of 600 MW controlled circulation boilers 600MW控制循环锅炉给水泵快速减负荷试验研究
Brief Discussion on Relation Between Maximum Output of Feed Water Pump and Fast Runback System 浅谈给水泵最大出力与快速自动减负荷系统的关系
This paper analyzes the runback process initiated by feed water pump trip, develops an equation for determining the runback rate, and proposes a method to determine feed water pump MCR. 文章对给水泵跳闸引发的RB过程进行了解析,提出了RB过程中减负荷速率的求解公式及给水泵最大出力的确定方法。
Realization of runback ( RB) function of primary air fan for domestically-made 600 MW unit 国产600MW机组一次风机RB功能的实现