Duration/ Cost Trade-offs in Project Scheduling with Time-Switch Constraints under Multi-Cost 多种费用下具有时间转换约束的工期费用均衡项目调度研究
The central heating is on a time-switch. 集中供热设备是定时开关的。
In this paper, an amended two-phase algorithm is presented to analyze networks with a special time-switch constraint. 提出了修正两阶段算法对具有活动模式时间转换约束的项目网络进行分析,包括寻找关键道路和计算各活动的浮动时差。
In this paper, we firstly introduce the problem description of time-switch constraints, and then build the arithmetic model of the DTCTPTSC_-P2; 本文首先介绍时间转换约束的问题描述,在此基础上,建立具有活动类型时间转换约束的DTCTPTSC-P2模型;
The Analysis of Project Networks with Time-switch Constraints 具有时间转换约束的项目网络分析方法研究