Big Blue Watery Road ( Passive): Urf is naturally faster and more agile in bodies of water. 碧蓝的水路(被动):海牛哥在水中移动更快,更为敏捷。
The URF has to meet the following main technical requirements: no disturbance to soils in the experimental area, keeping original state of groundwater table and chemical conditions of groundwater unchanged. 该设施须满足的主要技术要求包括:保持周围试验区土体结构稳定,保持地下水化学条件和水动力条件不被改变。
The method and results of the test, which was conducted in the experimental shaft of the CIRP ′ s Field Test Site, are introduced in this paper. 本文主要介绍在中国辐射防护研究院野外试验场地下研究设施(URF)试验竖井中进行的水平组件试验的方法和结果。