Under a traditional installation method a shafting is first mounted on a shipway and after a launching, the shafting undergoes an alignment through the adjustment of a main machine location. location of the machine tool, is worked out. 传统的轴系安装方法是先在船台安装轴系,后下水通过调整主机位置进行轴系对中安装。包括工艺流程、刀具的选用、机床的功率计算及布置等。
Since the assembly-time being cut to 1/ 3, and therefore the shipway time is shortened by this sequence. 应用新工艺后,安装时间仅为原来的1/3,从而大大缩短了船台安装日期。